Copper data points
Planning of workstations, routes and components according to distances, capacity and installation conditions.
Cabling is the physical foundation of connectivity. A tidy installation makes it easier to identify points, resolve faults and add workstations without losing control of the infrastructure. We define routes, materials and organization based on the space and the services to be connected.
Let's talk about your project
Cabling is the physical foundation of connectivity. A tidy installation makes it easier to identify points, resolve faults and add workstations without losing control of the infrastructure. We define routes, materials and organization based on the space and the services to be connected.
Companies and institutions that fit out offices, organize equipment rooms or need new data points and internal links.

Planning of workstations, routes and components according to distances, capacity and installation conditions.
Assessment of distances and connectivity between racks, areas or buildings to select a compatible solution.
Organization of patch panels, cabinets, routes and points to ease maintenance and future expansion.
We turn the need into a verifiable scope. The proposal identifies components, responsibilities, tests and support terms.
Data points and backbone links selected by distance, capacity and environment.
Physical organization, labeling and cable routes to ease operation and growth.
Point identification, test records and floor plans according to scope. Any instrument certification must be agreed in the proposal.
Spaces, capacity and growth.
Conduits, racks, labeling and standards.
Installation according to scope and assigned personnel.
Verification, labeling and documentation.
These answers help you compare options and prepare a useful conversation.
Its condition, identification and performance are inspected. The proposal may combine reuse and replacement when there is a technical justification.
Basic tests and instrument certification are different scopes. The instrument, criteria and report to be used are defined before executing.
Access, schedules, routes and possible interruptions are reviewed to agree on an execution compatible with how the site operates.
Floor plans or photos of the space, planned workstations, distances between areas, rack condition and available schedules.